We have begun yet ANOTHER home improvement project...Despite still not being done the siding and gutters (we started that over Easter break and its about 96% complete...) . We have moved on to the downstairs bathroom. Our plan is to be able to sell our house as a 2 full bath instead of a 1.5... last week Tim took out the walls, put up some framing and Matt came over and cut a big hole in our floor. Over the weekend a friend of ours did some plumbing and now it is shower ready! half of the ceiling and half of the wall are up.. and I am going to learn to drywall so I can do the mudding and get that to the point where it can be painted, and I am going to put down the floor so the sink and the toilet can go in. LOTS going on. We will see how quick we can get it done. the plan is to redo the upstairs bathroom over the Thanksgiving or Christmas breaks....I'll try and add some pictures when they are on the computer!
On another note I finally get to start substituting this week as soon as some openings pop up. I am still holding out for a full time job opening after Sept 30, but until then I have accepted a long term sub position that goes from October 23 to March 1. at the same school taht called me for an interview only to call back and cancel. should be interesting...... well I guess that is all the updating for now.. Rascal needs to go for a walk.
Tuesday, September 16, 2008
Wednesday, September 3, 2008
Welcome to our page!
I figured that it was time to actually start a page... If for no reason other than to just be able to keep track of everyone else! Tim and I are currently living in Delaware, where he works in the city as a high school math teacher/football coach/weightlifting coach. I am going back to substituting after a year with some great kids in the 4th grade. The commute, along with other things was just too much! We are currently in the process of finishing up some remodeling in the house so that hopefully we can move in the next year. Our siding is almost finished, then we just need the carport posts, and gutters. At the same time... our downstairs bathroom is being ripped out and enlarged- hopefully helping us when we go to sell. It's just a bunch of craziness around here so don't expect this page to be updated too often. It will probably be updated when there are breaks with school or if something major happens... (like if I get a call from a school district...)
Subscribe to:
Posts (Atom)